Solutions

sunset-land-survey-hero-background

    National Survey Solutions Projects Showcase

    3D Laser Scanning - exterior of Cluny Power Station

    Hydro Tasmania

    NSS were engaged to conduct 3D laser scanning & prepare a 3D CAV model for the exterior of Cluny Power Station and its surrounding environs. An integrated approach included a combination of traditional survey methods, UAV surveying terrestrial 3D laser scanning and 3D modeling. Project outputs informed studios of geotechnical issues at the project site.

    Midland Highway Safety Upgrades North, Spring Hill

    VEC Civil Engineering

    NSS were commissioned by VEC Civil Engineering to provide engineering surveying services for the upgrade of a 2.4km section of the Midland Highway at Spring Hill.

    Rokeby Catchment Stormwater Asset Capture

    Clarence City Council

    NSS were engaged by Clarence City Council to survey the Rokeby Catchment area and capture information for more than 600 stormwater assets. As part of the data capture NSS utilised UAV technology and 3D modeling to assist in producing up-to-date aerial imagery and a terrain model for accurate stormwater modeling.

    3D Laser Scanning -interior of Cluny Power Station

    Hydro Tasmania

    NSS were commissioned to conduct 3D laser scanning and prepare a 3D CAD model for the interior of Cluny Power Station in Ouse, Tasmania.

    Capability Statement 14 Visualization Survey

    Whitewater Park Pty Ltd

    NSS were commissioned to prepare a visualisation video for the proposed Whitewater Park subdivision to inform public consultation. NSS utilised UAV technology to capture the aerial video & worked with business partners to overlay proposed subdivision allotments & prepare the visualisation video.

    Southern Irrigation Scheme/Rekuna Dam

    Hazell Bros

    NSS were engaged to provide surveying services to Hazell Bros for work on the Tasmanian Irrigation Southern Irrigation Scheme & Rekuna Dam projects. Duties completed included survey control establishment, as constructed surveys, dam monitoring, leveling.

    3D Ground Model for Gretna & Bushy Park

    JMG/TasWater

    NSS were engaged by JMG to capture aerial photography & prepare a 3D ground model for a 15km road reserve corridor between Bushy Park & Gretna. They survey outputs were used to inform planning and design for the TasWater pipeline routes.

    3D Laser Scanning of Franklin Wharf

    DCS Civil Tasmania

    NSS were commissioned to complete 3D Laser Scanning underneath Franklin Wharf to ascertain position of piles, beams, and pre-cast. 3D models were prepared for precasting areas of the wharf.

    3D Laser Scanning of Coal Mines Historic Site Main Shaft

    PAHSMA

    NSS were engaged by PAHSMA to undertake 3D laser scanning of the coal mines historic site foreshore in 2015. The 2015 outputs were compared to 2012 baseline scans to determine total volume of material loss and differential material loss across the face of the coal dump feature.

    3D Laser Scanning of Coal Mines Historic Site Main Shaft

    PAHSMA

    NSS were engaged by PAHSMA to create a 3D point cloud model of the main shaft, engine block and nearby features at the Coal Mines Historic Site. The 3D data capture will be used to assist in engineering solutions to stabilise the shaft walls.

    Somerset Street Catchment Detail & Identification Survey

    Clarence City Council

    NSS were engaged by Clarence City Council to complete a detail survey identification survey & stormwater asset capture for the Somerset Street Catchment area. 

    Bruny Island Safety Barrier As-Constructed Surveys
     

    Protector Rail

    NSS were commissioned by Protector Rail to complete as-constructed asset capture & prepare as-constructed plans for safety barrier installations on Bruny Island.

    Kingston High School Relic Survey

    Spectran Contracting Pty Ltd

    NSS were engaged by Spectran Contracting to complete a detail survey of various structures on the demolished Kingston High School site & prepare a relic plan. Total stations captured on-ground features and UAV technology captured aerial imagery to provide an updated site image.

    Seven Mile Beach Road Survey

    Clarence City Council

    NSS were engaged to complete an engineering detail survey to facilitate design of proposed upgrades along Seven Mile Beach Road. NSS used an integrated approach with 3D laser scanning, RTK GPS & robotic total station solutions providing a safe, cost effective & fit for purpose deliverable to the client. 

    3D Laser Scanning -Palmerston Substation

    Zinfra

    NSS were engaged by Zinfra to conduct 3D laser scanning at the Palmerston Substation as per TasNetworks requirements. Project deliverables included 3D point cloud and truview.

    Montagu Bay & Rosney Hill Interchange

    VEC Civil Engineering

    NSS were engaged to provide engineering surveying services for the $15M Montagu Bay & Rosny Hill Interchange improvements project. NSS utilised UAV, 3D laser scanning & robotic total stations to perform tasks, including volmetric calculations, pavement surveys, establish survey control network, construction setout, monitoring, conformance surveys, machine control and design.

    3D Laser Scanning of Rosny WWTP

    TasWater

    NSS were engaged by TasWater to survey part of the Waste Water Treatment Plant located at Rosny, Tasmania.

    3D Laser Scanning of Tungatinah Substation

    Powercor

    NSS were commissioned to undertake 3D laser scanning of the Tungatinah Substation at Tungatinah, Tasmania.

    3D Laser Scanning at Macquarie Wharf 2 & 3

    TasPorts

    NSS were engaged by TasPorts to perform 3D Laser Scanning to assist in new fender system design along 320 metres of wharf. 

    3D Laser Scanning - Creek Road Substation

    Powercor

    NSS were engaged by Powercor to conduct 3D laser scanning at the Creek Road Substation, including 3 tunnels beneath the substation.

    Share by: